Red earth and spinifex either side of an outback track, seen from above

Exploration

Western Range

Location
Capricorn Orogen, north of Meekatharra, Western Australia
Country
Australia
Stage
Exploration
Commodities
  • Silver
  • Copper

80% interest, acquired from Standard American Metals LLC; the acquisition closed on June 24, 2026.

A defined pipeline of priority exploration targets, supported by historical geophysical work and limited modern follow up.

Highlights

  • Significant Geological Record: Benefits from a large historical dataset covering magnetics, gravity and electromagnetic surveys including work by BHP and Rio Tinto during 1990s
  • Defined Pipeline of Priority Targets: Several bullseye magnetic anomalies identified by BHP and Rio Tinto located on major northerly trending structures and regional gravity gradients, presenting analogously to the Abra Deposit and the Teano River.
  • Large Holding in a Proven District: 19,330 hectares north of Meekatharra in Western Australia, partially contiguous with the Abra Mine.
  • Clear Avenues for Value Creation: Prime candidate for a concise program of confirmatory geophysics followed by a targeted drilling program, focusing on named anomalies and expansion potential.

Overview

The Western Range Silver Copper Project consists of three tenements for a total of over 19,000 hectares located in the Capricorn Orogen, north of the mining town of Meekatharra in Western Australia, and benefits from the infrastructure of neighbouring operations and labour availability of surrounding towns.

Western Range Project map: the Augustus, Tino Range and Abra South tenements, with Abra South next to the Abra silver mine

History

Historical exploration in region began in the 1970s, when Amoco initiated base metal exploration across the broader district, mainly targeting exposed prospective units of the Edmund Subgroup. The Abra deposit, which is partially contiguous with the Project area, was not tested until 1981, when Geopeko drilled a single diamond drill hole (AB3) into the deep magnetic target. Intersecting a sequence of stratabound chlorite hematite magnetite barite altered rocks, mineralisation included 27m averaging 6.1% Pb; 194m averaging 3.1% Pb; and 19m averaging 3.68g/t Au and 1.1% Cu. Between 1981 and 1989, 13 drill holes were completed at Abra, all intersecting a similar sequence of altered and mineralised rocks.

This work helped confirm that the Capricorn Orogen and Bangemall Basin could host substantial concealed base metal systems and provided the geological context for later target generation across nearby tenements.

Western Range sits along the same structures as the Abra deposit, with Abra South being contiguous with the Abra site. In the December 2025 quarter, Abra reported 32,415 tonnes of concentrate produced at grades of 242.8 g/t silver and 61.2% lead, containing 253koz of silver and 19,756 tonnes of lead.

The Company aims to benefit from the existing infrastructure of the Abra mine and is positioned to move toward advanced exploration following confirmation of the existing targets and expansion drilling.

Targets

Identified by BHP and Rio Tinto in the 1990s, Western Range targets were left underexplored due to corporate shifts by BHP and Rio. Targets include several bullseye magnetic anomalies located on major northerly trending structures and regional gravity gradients, presenting analogously to the Abra Deposit and the Teano River. Only one of these targets was drilled to 160 meters, short of the target depth of 175 to 215 meters, due to high water flows. BHP did not revisit the drillhole as this coincided with their shift away from Australian exploration.

Western Range is a prime candidate for a concise program of confirmatory geophysics followed by a targeted drilling program, focusing on these anomalies and expansion potential.

Technical Report

The NI 43-101 Technical Report on the Western Range Project, Western Australia, by Indeport Pty Ltd, has an effective date of June 22, 2026. Read the acquisition announcement.

The scientific and technical information on this page has been reviewed and approved by Neal Lindsay Leggo B.Sc.(Hons), MAIG, an independent geological consultant to the Company and a Qualified Person as defined by National Instrument 43-101. In accordance with NI43-101CP, the Company cautions that results, resources, and other technical findings of adjacent properties, including the Abra deposit, are not necessarily indicative of the mineralization on the Western Range project.