Option to acquire a 100% interest. Binding letter of intent dated November 12, 2026; the transaction remains subject to TSX Venture Exchange approval.
Two porphyry targets immediately west of Imperial Metals’ Mount Polley copper gold mine, in British Columbia’s Quesnel Terrane.
Highlights
- Between two major producing copper mines: Miracle adjoins Imperial Metals’ Mount Polley copper gold mine. Gibraltar, Canada’s second largest open pit copper mine, lies approximately 34.5 kilometres to the west.
- Exploration program completed in November 2026: Airborne magnetics and transient electromagnetics were completed over the project area, covering more than 6,300 hectares, with technical reports expected in December 2026.
- Two distinct porphyry exploration targets: Historical geological interpretation identified the Miracle Porphyry and Trio Lake Porphyry target areas, untested by a systematic exploration program.
- Extensive historical exploration database: Previous work includes geological mapping, geochemical surveys and geophysics, with minimal drilling and numerous untested targets.
- Existing multi year drilling permit: The Project is covered by a British Columbia exploration permit, valid to 2031, which authorises up to 50 surface drilling sites.
About the Miracle Copper Gold Project
The Miracle Copper Gold Project comprises over 6,300 hectares across two mineral claims in south-central British Columbia, approximately 72 kilometres east of Williams Lake, with established year round road access. Located within the prolific Quesnel Terrane, Miracle shares geological similarities with the nearby producing Mount Polley and Gibraltar copper mines and benefits from their established infrastructure.

Mount Polley began production in 1997. Imperial Metals reported production of 4.104 million pounds of copper and 7,931 ounces of gold for the quarter ended 30 September 2026. Its revised full year guidance is 16-18 million pounds of copper and 30,500-33,700 ounces of gold. Imperial reported an Indicated Mineral Resource of 188.1 million tonnes grading 0.25% copper and 0.29 g/t gold as at 1 January 2026. Its mine plan extends to 2034.
Gibraltar began production in 1972, restarted in 2004 and has an expected mine life to at least 2044. Trekor Metals Limited reported production of 33.9 million pounds of copper for the quarter ended 30 September 2026 and expects full year production of 115-120 million pounds of copper. At 31 December 2025, Trekor reported Measured and Indicated Mineral Resources of approximately 976 million tonnes grading 0.25% copper.
Historical exploration at Miracle has identified several geological features of interest in this broader regional context, including intrusive rocks, hydrothermal alteration, brecciation and anomalous copper gold geochemistry which present similarly to Mount Polley.
Miracle joins the Company’s Island Range Copper Gold Project on Vancouver Island and its Western Range Project in Western Australia.
Q4 2026 Exploration Program
An exploration program across the over 6,300 hectare project area was completed in November 2026. The program used two airborne survey methods to follow up historical anomalies beneath cover:
- Airborne magnetics mapped variations in the magnetic properties of the rocks to help trace intrusive bodies, geological contacts and structures.
- Airborne transient electromagnetics (TEM) measured variations in subsurface conductivity to identify conductive features for follow-up.
The Company expects initial technical reports in December 2026 and will integrate the results with historical mapping, geochemistry and drilling to prioritise high priority drill targets.
Option Terms
The Company is acquiring the exclusive option to acquire a 100% interest in the Project by purchasing all the issued and outstanding shares of the vendor for an aggregate of 10,000,000 common shares, of which 5,000,000 will only be issued upon fully exercising the option; on completion, the vendor becomes a wholly owned subsidiary and continues to hold the option. To exercise the option (all amounts in Canadian dollars):
| Due on or before | Cash payment | Expenditures | Shares (value) |
|---|---|---|---|
| October 19, 2027 | $125,000 | $295,000 | $300,000 |
| October 19, 2028 | $150,000 | $1,000,000 | $500,000 |
| October 19, 2029 | $175,000 | $2,000,000 | $750,000 |
| October 19, 2030 | $300,000 | $3,000,000 | $1,000,000 |
| Total | $750,000 | $6,295,000 | $2,550,000 |
A further $6,000,000 in common shares is issuable on milestones: $1,000,000 on completion of a Bankable Feasibility Study and $5,000,000 on declaration of commercial production.
Upon exercise of the Option, the Project will be subject to aggregate net smelter return royalties of 3.0%. The Company will have the right to repurchase 0.5 percentage points of those royalties for $1,000,000, reducing the aggregate royalty to 2.5%. The transaction is at arm’s length, with no finder’s fees.
Read the acquisition announcement
References
- Gust, N. (2024). Prospecting Report on the Miracle Property, Mineral Claims 1069444 and 1069445, Cariboo Mining Division, British Columbia. Prepared for Eagle Peak Resources Inc., dated April 24, 2024. Statement of Work Event No. 6008295.
- Panteleyev, A., Bailey, D.G., Bloodgood, M.A., and Hancock, K.D. (1996). Geology and Mineral Deposits of the Quesnel River-Horsefly Map Area, Central Quesnel Trough, British Columbia. British Columbia Ministry of Employment and Investment, Energy and Minerals Division, Geological Survey Branch, Bulletin 97.
- Imperial Metals Corporation (2026). Imperial Reports Third Quarter 2026 Financial Results. News release dated November 5, 2026.
- Trekor Metals Limited (2026). Trekor Announces $164 Million of Adjusted EBITDA in Third Quarter. News release dated November 4, 2026.

